KUSUM · OPEX / IPP
Distributed government solar execution across 16 locations.
- Project
- Government Solar Programme
- Capacity
- 150+ MWp
- Location
- 16 locations · Maharashtra
The context
A 150+ MWp portfolio of decentralised renewable infrastructure required execution across diverse land parcels, terrains and grid interfaces in Maharashtra.
01
The challenge
The programme combined multi-location land development, transmission rights of way, varied terrain, technology choices and policy-linked timelines.
02
SunInfra’s response
- Standardised multi-site delivery framework
- Dedicated coordination for land and clearances
- Flexible engineering for terrain and technology variation
- Central controls with accountable site teams

Business impact
What the project
unlocked
- 01Scaled execution across 16 locations
- 02Managed complex land and transmission interfaces
- 03Delivered both fixed-tilt and tracker configurations
- 04Built a strong record in policy-led infrastructure